Electric installation work of Novosibirsk



Electric installation work :

Total items: 287, Views: 138064
The Russian engineering design and installation organization PROFENERGY was established in early 2007. The main direction of the company is engineering services, design and installation works in the field of electric power industry.
PROFENERGY is fully responsible for the final result. In such a situation, it is very important that key departments and specialists: designers, engineers, logisticians, suppliers, installers work in a single business process. This makes it possible to much more effectively manage the priorities of individual groups of specialists in the interests of the entire project.

The company performs a full range of design and electrical installation works, carries out construction, reconstruction and technical re-equipment of electric grid facilities for voltage class 6–10, 35, 220 kV.

One of the main activities of our company is the construction of overhead power lines. Hundreds of kilometers of power transmission lines with a voltage of 0.4; 6; ten; 35; 220 kV, during the construction of which the most advanced construction methods were used.

As a result, project deadlines are met, possible problems are resolved faster, the procedure for making adjustments to the project and their coordination with all interested and controlling organizations is simplified, in addition, the control function on the part of the customer is simplified.
Rostelecoms
Novosibirsk, str. Chaplygina, 2/1

tel. +7 (383) 222-18-81
Actual on 01.01.2018
Spetsstroy
Novosibirsk, str. Igarskaya, 14a

tel. +7 (383) 299-51-41
Actual on 01.01.2018

1

2

3

4

5

6

7

8

... 

29

All applications are subject to mandatory moderation.
Project INCITY.ORG.UA © 2024