LCD Light



Views: 57

Construction of residential complex consists of five 25-31-storey cast-frame construction and is located in the southern part of the designated areas.

Heating LCD Light is available from its own gas boiler

Designed playgrounds for children, recreation area adults and playgrounds for physical education classes. Areas for waste collection made from gaming and sports sites at a distance of 20 meters.

Storage of vehicles of residents of the complex provides open-air Parking on the perimeter of the building at 1445 m/m.

For residents and visitors to the shopping centre do not have personal transport provided by bus routes.

On the territory of the residential complex is located 4 preschools – stand-alone kindergarten on 180 places and 3 built-in and attached houses kindergarten with 72 seats.

The school will be located to the South of the territory of the PO, beyond the border of the residential complex, according to the sketch construction of a residential area "North of Khimmash".

About prospects of development of the district can be viewed here (the resolution of the head of Yekaterinburg №1546 from 04.05.09)

 



Address:

Russia
Sverdlovsk Oblast
Ekaterinburg city

str. Malysheva, 5, 8 etazh, str. 9

tel. 8 (343) 310-35-95


http://svetliy-ekb.ru/
Actual on 01.01.2018
Project INCITY.ORG.UA © 2024